Subsidence caused cracks in the floor and walls of a house extension in Surhuisterveen. The solution? The URETEK FloorLift® method.
“Due to subsidence of the subsoil, part of the conservatory floor had subsided by around 1.5 cm,” explains Martijn Kamma of Buwalda Multiservice. “The owner of the property asked me if I could fix the problem. Through a renovation company I’m friends with, I came into contact with URETEK. They were happy to take on the challenge.”
Down to the last detail
“On the agreed day, the URETEK team arrived with top-of-the-range equipment. Everything had been prepared down to the last detail and the problem was quickly resolved; in just over an hour, the floor was level again. It fits perfectly against the skirting board: it looks fantastic. Buwalda Multiservice then took care of neatly grouting and finishing the floor.”
Good luck
“The homeowner – head of technical services at a regional property management company – was so pleased with the result that he’d like to apply this method to the properties managed by his employer as well. I have since successfully completed another excellent project here with URETEK. Hopefully, this marks the start of a fruitful, long-term collaboration!”