Brick floor of former coach house largely removed

Work on a 100-year-old floor The brick floor of a listed former coach house in Amsterdam had – since its construction in 1907 – largely subsided. URETEK rose to the challenge ...

The cause of the church floor’s subsidence has been neatly resolved

Walking into the church without any echo The tiled floor of the entrance halls of the Roman Catholic St Lambert’s Church in De Weere had subsided. This could be felt and heard w...

Quick solution for settlement cracks in a listed building

Three façades of a listed building in Tegelen were showing settlement cracks. The solution: the URETEK DeepInjection® method, which was used to stabilise the subsoil. Joep Selen...