Commissioned by the owner, Aannemingsmaatschappij Hegeman B.V. from Nijverdal set about renovating a retail premises in Groningen. The URETEK FloorLift® method was used to raise the subsided floor.
Reinold Jansen is a project manager at Aannemingsmaatschappij Hegeman. He explains: “The floor of the retail premises had subsided considerably; by an average of four centimetres and in some places as much as seven to eight. Something really had to be done about this. Levelling the top surface was not an option. Fortunately, the chief structural engineer came up with the idea of calling in URETEK.”
Ideal solution
“It’s amazing what the team at URETEK have achieved using a technique that, at first glance, seems relatively simple – truly remarkable! This method was the ideal solution to this problem. Unfortunately, a pipe was struck during the work, which wasn’t in the indicated location. A minor mistake, but it was neatly resolved.”
Accurate
“Working with URETEK was a very pleasant experience: the quote was clear, the advice sound and the result is excellent. The team worked with great precision and left the site in a spotless condition. The floor now looks great and everyone involved is satisfied.”