A 16 cm prolapse was corrected in two days

The FloorLift® method gives your floor a brand-new look The 250 m² floor of the compressor room at Logoplaste in Elst had suffered considerably under the weight of heavy machine...

Bolsius candle factory back in safe operation thanks to ground stabilisation

Tom van der Horst, Bolsius: A tank embankment at the Bolsius candle factory in Moerdijk had started to settle. Using the URETEK method, the subsoil was stabilised and the founda...

The fallen giant is back on its feet

When you see the colossal structure and hear how much it weighs, you really can’t imagine it being possible. Lifting a 70-tonne crusher unit that had sunk out of alignment, along...