Production floor with a difference in level perfectly levelled

A floor in Polytec’s production area in Roosendaal had subsided to such an extent that a 7 cm difference in level had arisen. This posed a hazard to staff walking around the area...

Minimal disruption, great results

2,400 m² of industrial flooring raised Four floor sections at Mennens Belgium – a manufacturer of steel cables, hoisting and lifting equipment – had subsided significantly. I...

Safety has been restored

The URETEK method is quicker and ultimately cheaper Several floors in Raab Karcher’s storage facility in Vriezenveen had subsided as a result of ground settlement. This had cr...

The result of URETEK’s work? Better than expected!

A garage belonging to the municipality of Moerdijk in Klundert had subsided so much that vehicles were rolling off the bridge of their own accord. URETEK was called in to resolve t...

Three flooring jobs carried out by a single company, with perfect results

Working safely again without noise pollution Concrete industrial floors that are becoming increasingly uneven – and therefore more dangerous. At Twinpack in Noordwijkerhout, a w...

A flawless process, a virtually perfect result

Part of the reinforced concrete floor at the vegetable auction in Mechelen, Belgium, had become detached from the subfloor. Some sections of the floor moved when you walked or drov...

Load-bearing capacity of the floor in the fire station garage on the petrochemical site restored to standard

Property Services Manager at a fire station on a petrochemical site: The concrete floor of a fire engine garage on a petrochemical site in Antwerp had subsided significantly in ...

Bolsius candle factory back in safe operation thanks to ground stabilisation

Tom van der Horst, Bolsius: A tank embankment at the Bolsius candle factory in Moerdijk had started to settle. Using the URETEK method, the subsoil was stabilised and the founda...

Concrete industrial floor once again suitable for heavy-duty use

Sagging floor in Heerlen The sand bed beneath the concrete floor of an industrial unit belonging to Ranpak B.V. in Heerlen – a manufacturer of paper packaging ...

Factory floor out of alignment

At Twin Filter in Zaandam, there are 6-metre-high warehouse racking units on the factory floor. These can only remain in safe use if they are standing on a level surface. If the fa...